My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5929 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
5929
>
BASE FILE
>
5929 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 10:01:56 PM
Creation date
2/9/2017 10:00:40 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5929
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' g. The more office windows that are visible to the parking area, the safer the area is <br /> from assaults and thefts. <br /> h. If utilizing fencing, it should be 6 feet chain link. <br /> i. During the final stages of construction, please contact Dick Thornberry, Crime <br /> Prevention O�cer, at 259-0416 for further security recommendations, <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed <br /> development. For further information about the electrical service requirements for this <br /> project, please call Kurt Martin of the DistricYs Customer Engineering Office, Everett at <br /> 258-8291. <br /> 3. GTE Northwest Incorporated will provide service to the site. However, new telephone <br /> cable construction will be required in conjunction with the site developmPnt. GTE's <br /> engineering will begin when they are notified of your construction scheduies and <br /> telephone requirements. <br /> It will be the developer's responsibility to provide a suitable combination of conduit and <br /> trenching and/or riser conduit to accommodate GTE's network communications cable <br /> within the complex. Provided that an acceptable combination of conduit and/or <br /> trenching is incorporated into the project to accommodate GTE's entrance cable, there <br /> will be no costs to the developer for GTE's cable. <br /> if a rearrangement of existing cables on premises or on the right-of-way is necessary, <br /> approprate charges will be estimated and GTE's Guaranty of Payment form will be <br /> forwarded to you for your signature. Prior to commencement of GTE's engineering for <br /> such rearrangement, a deposit will be required. To insure timely telephone service, <br /> GTE requests ninety (90) days lead time for engineering, procurement, and installation <br /> of cable and/or GTE's equipment. <br /> Please contact Michael Hupf, Senior Engineer, at 356-4052 should you require <br /> additional information. <br /> � 2930 Wetmore, Suite 100, F.verett, WA 98201 '�' (20�259-8731, Fas (206) 259-87-�2 <br /> 8 <br /> e <br />
The URL can be used to link to this page
Your browser does not support the video tag.