Laserfiche WebLink
SEPA // 82-48 -- -. .. . _ - <br />13. A one-year Guarantee is required on ihe public street and landscaping for an amount <br />not less than 10% of the cost of construction and shall run for one year from the date <br />of issuance of the first Occupancy Permit for the project. <br />14. Any work within the low flow channel of Pigeon Creek will require a hydraulics project <br />approval by the Department of Fisheries. Energy dissipation will be required at all <br />storm sewer outfalls. <br />15. Park;ng lot must meet City parking code requirements and provide handicap parking per <br />code. <br />Proponent <br />Kenneth Schilaty <br />1716 Terrac_ <br />Snohomish, WA 98290 <br />Locatior� of Proposal <br />5700 Evergreen Way <br />Lead ARency: <br />Contact Person: <br />City of Everett Planning Department Receipt No. <br />Bob Landles Phnne: 259-8731 File No. <br />This proposal has been determined not to have a. significant adverse impact on the environment. <br />An Environmental Impact Statement is not reGuired under RC1V 43.21C.030(2)ic). This deci:;ion <br />was made after review b;� the lead agency of a completed environmental checklist and other <br />information on file with t?�e :ead agency. This Declaration of Non-Significance is specifically <br />conditioned on compiiance with the conditions attached her�*.o which are incorporated by reference <br />as if fully set forth herein. <br />A fifteen day review period has elapsed for this project and no adverse comments �vere received. <br />Responsible Official: <br />Titic: <br />Dennis Dericl:son <br />Planning Director <br />patc: Octob 15, 1932 <br />. � <br />Signature: <br />NOTE: This final Declaration of �on-Significance may be wittidraa�n in the event oi si�niiicant <br />changes in tiiis proposal, or failure to comply with the conditions upon �vhich tliis Declaration <br />of �on-Significance is predicted. <br />