Laserfiche WebLink
WATER SERVICE <br />ALDERWOOD 1AIATER D15TRICT <br />3626 - 156th St. S.W. <br />Lynnwood, Washington 98037-2399 <br />743�46U5 <br />Serving South Snohomish Counfy <br />November 15, 1990 <br />Mr. Dan Mathias, Project Manager <br />City of Everett <br />Public Works Department <br />3200 Cedar 5treec <br />�veiett, Washington 98201 <br />Subject Aldenvood Pump Stadon No. 2 <br />Stotm Drain and Frontage improvemenc� <br />Dear Dan: <br />��1 <br />AT [: <br />SEWEfl SERVICE <br />1875.0044 <br />We have received a request from the Ciry of Everett (City) to include some storm drainage <br />and frontage impmvement work as part of our cons�ucuon of the subject Aldenvood pump <br />Stadon No. 2 Project This projecc is to F,e consu�ucted on properry leased from the Ciry. <br />It is our unde�tanding chat the Ciry's share of the cost of this work would be reimbuiscd to <br />the Alderwcod Nater Disuict (Dis�icc). The District is willing to construcc this work as <br />parc of our project as long as this work can be accomplished withouc delaying the �ject <br />compledon. This letter has been pre�,azed to serve as a letter of underscanding becween [he <br />City and the District to define the terms and condidc+ns under which this desi;n and <br />construcdon will be accomplished. <br />It is our understanding that the wor'x which the Ciry would like to have consrructed <br />includes, more snecifically, the following ttuee items: <br />Cons�uct approximately 600 LF of 48-inch storm drainage line from the <br />Alderwood Pump Stadon Sice south to Berkshire Drive. This pipe would <br />upsize and replace an exisdng 24 to 30-inch line upsa-eam of the sice. <br />2. Increase the size of the exisdng 30-inch storm diain on the pump sradon site to <br />48-inches. <br />3. Install frontage improvements in the right-of-way along Ever,een Way to <br />inciude curb, gutter, stdewalk, and drainage system improvemenu. <br />As you know. the Disaict received bids for the Pump Starion No. 2 project on November <br />13, 1990. The bids received were based on the exisdng plans which do noc currendy <br />reflect the proposr� changes described above. Our plan would be to prepare revised pians <br />and specifications to define the proposed additional work. The revised pians and <br />spec�cations wouid be presented to our Conaactor to obtain a price for the work. A <br />change order would then be prepared based on the negodaced price. Sepazate prices would <br />be established for each of the three "projects" to be included in the change order. <br />� <br />