Laserfiche WebLink
JNM James M. Mont� <br />Consulting Engineers, Inc. <br />2375 1301h. Avenue NE <br />Suiie 200 <br />Bellewe <br />Washmyton 9d005 <br />a_� 7' <br />� ��`�✓ �-,� , � k, <br />�y ✓ os�" �s W°r <br />C�/ <br />cF'"�� �/`�" ��s� n���s 'a'`��I„s �'� . <br />December 18, 1990 Gc 1���s `��iz � �v�51875.0044/3.1.6 <br />� 1�, D l� ���,Tz� � �a, <br />!�"�J� l ���M�r�� � <br />Mr. Kirk Brooks /ti9�^ J ;(�' ��a <br />Ciry of Everere ��v ��c��'�' � ,� �� � � <br />Department of Public Works ��� r c� •�f o- <br />3200 Cedaz Street D� � I � �� �" �� ��s �. <br />Everett, Washington 98201 �,� �� z cm� o° <br />Subject: Alderwood Pump Station No. 2 Project <br />DPW Pemut Applicarion No. 90/25945 <br />Dear Mr. Brooks: <br />Gd � o�'"S �,� `P <br />�� r ILS�� � �v <br />cr Sz�,��s�o�,.. <br />o�� ,�s <br />Gos <br />As we discussed by telephone last week, I have prepared this letter to document the <br />Alderwood Water District's (District) actions in response to two of the review comments <br />received from DPW's review of the pernut application for the subject project. The Everett <br />DPW has requested that the District include the following two items of work in the work at <br />the pump stadon site: <br />1. Upsizing of the storm drain pipe on the site from 30-inches (the existing pipe <br />size) to a larger size adequate to cazry the projected flows (approximately 48- <br />inches). The City of Everett (City) has agreed to pay for the incremental <br />increase in the cost of this upsizing. <br />2. Construcdon of frontage improvements along Evergreen Way in front of the site <br />including curb, gutter, sidewalk, and drainage system impro �ements. The City <br />has agreed to pay for their shaze (r]�ree-fourths) of the cost of these frontage <br />improvements. <br />The District has agreed to undertake the construction of this additional work as part of their <br />pzojeci at the site. However, due to the late point in our project schedule at which these <br />requests were received, it was not possible to complete the design of these additional <br />faciliries to be included in the original contract bid. The District has proposed to <br />incorporate these components of the project by a change order to be negoriated with the <br />Contractor, as described in the attached letter from Jim Blunck to Dan Mathias dated <br />Novernber 15, 1990. The City has agreed to this approach as evidenced by Dan's <br />concurrence to this letter and his attached letter to Jim Blunck dated November 16, 1990. <br />