Laserfiche WebLink
. , <br />C'�C' Ctf <br />� <br />Of�JO(OrC'C� <br />Intlependent Tesling 8 Engineering Services lor Elecirical Power Systems <br />Pacific Northwest <br />REGIONAL QFFlCE <br />3290116TH PLACE, S.E. <br />BELLEVUE, WA 98007 <br />(208)582-0188 <br />FA% (206) 582-0787 <br />■ '• � � .�� <br />ETI REFERENCE NO: 91301439 <br />DOZIER ELECTRIC <br />PVST OFFICE BOX 2493 <br />WOODINVILLE, WASHINGTl1N 98072 <br />ATTENTION: <br />� ' 1� • • <br />Mlt. N:IKE DOZIER <br />APRIL 19, 1991 <br />LOCATION: <br />ALDE�2WOOD PUMP STATION <br />EVERETT, WASHINGTON <br />TWO CIRCUITS: <br />SERVICE ENTRANCE <br />VFD FEEDER <br />The purpose c?' cable hypotential acceptance tests is to <br />determine if the cable is �uitable for energization at <br />system voltage stresses. Cables found defective can be <br />replaced or repaired prior to final utilizatfon. <br />2.0 a�[�$,i <br />At the request of Mx, Mike Dozier of Dozier Electric, <br />Electro-Test was contacted to test the subject cables. All <br />testing was performed on February 8, 1?91 by Electro-Test <br />Enqineer Mr. Jim Hunnicutt. The helpful assistance of Mike <br />Doxier was appreciated in c.ompleting the testing. The test <br />results indicate the cables to be satisfactory for <br />energization. <br />3.1 Six (6) Ganduc'cors, Rome Cable, 5kV, XLP insulation, <br />133$, 500 MCM. <br />4.0 PROCEDU�jjE:',, <br />Each conductor was tested individually with cables �iot under <br />test grounded. The cables were energized and leakage <br />current monitored to i�hield and ground. <br />Tests were performed in accordance with ICEA standard. <br />ALBUOUEROUE • DENVER • LLS ANGELES •• PHUENI% • PURiLANn • SALT LAKE CITY • SAN DIEGO • SAN FRANCISGO ' SEATTLE <br />