Pags 2 <br />4.1 Step Yoltaqe Test <br />The cab�es were raiaed in 5kV ateps to a maximum test <br />potential of 25kV. D.C. leakaqe current wae monitored <br />at each-step aP..ter a stabilization time of one (1) <br />minute, eonsi�tenti �rith eystem charging current. <br />4•2 Absorgtion Test <br />The cables energizad at the 25kV level were monitored <br />for leakaqe Gurrent at half minute intervals for the <br />first two minutes and then at one minute intervals for <br />a total qf 15 minutes. <br />4.3 Voltage Decrement Test <br />At the co�:apletion of the abso•rption test, the potential <br />was removad from the cables and the voltage and time <br />monitored as the cable discharged t2�rough its <br />diel�etric vnlume resistance. <br />5.0 R � tt•T <br />5.1 The test resulte and. eva.luation indicate the cables are <br />satisfactory for energization. <br />ucmitted by, <br />� <br />im Iiunnicutt <br />dsk 44 <br />