Laserfiche WebLink
r / <br />C ` <br />6. Foundation and wall sections for the new storage offce shoald be included in the <br />construction documents. <br />7. T'he notes on sheet 1/6 indicate compliance with the requiremenG of WSEC 1310.2 <br />for semi-heared spaccs. Part of these include insulating the roof. The method of <br />insulation should be included. <br />Prepare a response letter showing where each item in this coiTection letter is addressed on the plan <br />set. <br />Upon resubmittal of the drawings, your application wi(I be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure that <br />the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, ,�, �,� <br />%� �� <br />S[eve Miller <br />Asso�iate Eneineer <br />5)I DEDVPLNCI:LTR/1918,19:].1916GR.\\'p <br />