My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7016 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7016
>
7016 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2017 1:13:58 PM
Creation date
2/9/2017 11:13:48 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7016
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�;r ' , � <br />.�;:,,,; Perteet Enginee��ing, Inc. <br />, ,`., <br />�. ., <br />_ �s <br />October 29, 2001 <br />�:,:'. <br />:..' <br />;�'::; ', : <br />X: : <br />;'�;: <br />�.i: <br />�:':: <br />.Y : • _ <br />�~'� <br />:�:R = <br />;�;r..:, <br />�;�, <br />Mr. Wayne Wentz, P.E. <br />City of Ever.•tt Department of Public Works <br />3200 Cedar Street <br />Everett, Washington 98201 <br />�� <br />Re: Trip Generation Analysis for the Proposed Sunrise Service Vocallonal Center <br />Perteet EngineerIng Project No. OIT31-OQ <br />Dear Mr. Wentz: <br />This letter documenu the trip generation study conducted for the proposed Sumise Service <br />Vocational Center Building remodel and pazking lot development in Everett, Washington. The <br />analysis addresses the trip generation and mitigation requ'vements in accordance with the City of <br />Everett Ordinance 2425-99 guidelines. <br />Project Description <br />The project site is located at 2016 Evergreen Way. The proposed project includes the remodel of <br />an existing 4,032 square foot building from retail uses to classrooms and the construction of a 26- <br />stall parking lot for future students and staff. Access to the site will be provided by the existing <br />access for the site which accesses Evergreen Way. A proposed secoud access to the planned <br />parking lot will ingress and egress from East Cady Road. <br />Trip Generation <br />'('he trip geaeration estimates for the proposed vocational classroom use building are based on <br />staff and enrollment iuformation provided by Sunrise Service, Inc. as the future tenaut of the <br />bui]ding. Since there are no trip rates available in the Institute of Transportation Engineers'(ITE) <br />Trrp Generalion manual for the proposed use, trip generation calculations based on the <br />irformation provided by the tenant and the following assumptions were uh'lized: <br />• Each staffmember and student will generate rivo trips per day (i.e., 2 ADT). <br />. The p.m peak hour occurs between 4:00 to 6:00 p.m <br />. The ADT and p.m peak hour trips generated by the project is averaged over a two- <br />week/10 day cycle based on the class operations discussed below. <br />�.. .,�., �..�...�� m. ovvni .4zs-252-7700 • Fax 425-339-6��$ • µ'ww.perieet.com • I-800-615-9900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.