Laserfiche WebLink
Mr. Wayne Wentz <br />October 29, 2001 <br />Page 3 <br />Table 1 <br />Trip Generation Summary <br />The trip generation summary indicates that the proposed Sunrise Service Vocational Center <br />remodel development will generate net new trips totaling 15 ADT with 17 p.m. peak hour trips. <br />Traffic MitiQation Requirements <br />The City of Everett's mitigation policy as outlined in Ordinance 2425-99 requue a contn'bution to <br />the City for the development's fair shaze cost of implementing future local transportation <br />improvements. The contnbution is based on the cunent traffic mitigation fee of $900 per p.m <br />peak hour trip generated by the proposed development (ref. Section 11). A mitigation fee <br />contnbution is required for all projects which generate 1� or more daily trips. The proposed <br />Sunrise Service Vocational Center remodel will generate a net total of 17 p.m peak hour trips <br />more than the eadsting building use. <br />Based on the trip generation analysis and mitigation criteria descn'bed above, the total traffic <br />mitigation fee cost contnbution to the City for the proposed Sunrise Service Vccational Center <br />remodel would be$1�,300 ($900 x 1 i p.m peak trips) to mitigate the traffic ir-�paccs on the <br />arterial street system. <br />3� <br />