Laserfiche WebLink
4. A traffic mitigation fee of $15,300.00 is required prior to issuance of any building permits (SEPA <br />Transportation Policies). <br />5. Evergreen is designated as a"Gateway" corridor in the City's General Plan. The General Plan <br />states, "Because Everetl wants to develop and promote an attractive image, all entry corridors into <br />the City should be designated as "Gateways" and standards should be applied to developments <br />along such "Gateways" relating to building design, landscaping, signage, outdoor storage and other <br />aesthetic considerations that will serve to upgrade Everett's image " To meet the intent of the policy, <br />landscaping in excess of Type III must be provided along Evergreen Avenue. (SEPA Land and <br />Shoreline Use Policies.) <br />The lead agency for this proposal has determined that it does not have a probable significant adverse <br />impact on the environment. An Environmental Impact Stalement is not required under RCW <br />43.21 C.030(2)(c). This determination assumes compliance with State law and City ordinances related to <br />general environmental protection including but not limited to right-of-way improvement requirements, <br />drainage, etc. This decision was made after review of a completed environmental checklist and other <br />information on file with the lead agency. This information is available to the public on request. This <br />Mitigated Determination of Non-Significance is specifically conditioned on compliance with the conditions <br />attached hereto which are incorporated by reference as iF fully set forth herein. <br />Responsible <br />O�cial: Paul A. Roberts <br />Title: Planning and Community Development Director <br />Address: <br />Date: <br />Signature: <br />2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br />You may appeal this determination by filing an appeal on fortns provided by lhe Planning Department and a <br />fee to the Planning/Gommunity Development Permit Services Counter at 3200 Cedar Street, 2nd Floor, no <br />later than 14 days from the date the MDNS becomes final. <br />Contact Becky Fauver to read or ask about the procedures for SEPA appeals. <br />NOTE: A DNS may be withdrawn in the event of significant changes in the proposal, disclosure of <br />new�significant information, misreprasentation by the applicant, or failure to comply with the <br />conditions upon wliich this Detertnination of Non-Significance is predicated. <br />- - 2 �� --- - - _- — - <br />