My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
7601
>
BASE FILE
>
7601 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 4:07:22 PM
Creation date
2/9/2017 11:59:30 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. That the following improvements to public right-of-way <br />I take place: <br />a) Evergreen Way: <br />- installation of a temporary traffic signal at the shopping i <br />center entrance on Evergreen Way, approximately 300 feet <br />I south of 75th Street. ** <br />j <br />- Construction of right -turn lane north bound on Evergreen Way <br />at 75th Street intersection (between entrance and 75th Street) <br />- Construction of right -turn only deceleration lane on Evergreen <br />Way south of the entrance to the center. j <br />Installation of curb, gutter, and sidewalk along projects ! <br />i frontage on Evergreen Way <br />Prohibition of truck traffic. at Evergreen Way entrance. <br />b) 75th Street: <br />- Deed 20 feet of right-of-way along the south edge of 75th Street <br />between Evergreen Way and the east property line of the project, <br />a distance of 609 feet. <br />Add a two-way left turn lane on 75th Street the full length <br />of the project's frontage on 75th Street <br />Construct a right -turn curb lane along 75th from Evergreen Way <br />to the east property line of the project. <br />- Installation of curb, gutter, and sidewalks along 75th Street <br />from Evergeeen Way to the east property line of the project. <br />4. That the operation of the shopping center shall be in compliance <br />with Washington State Noise Regulations (WAC 173-60). <br />I5. That spotlightL, floodlights, or any other lighting, along with <br />signs, shall be shielded so as to not produce glare or nuisance <br />into adjacent residential properties or public right-of-way. <br />6. That a pathway for pedestrians be constructed from the northeast <br />corner of the shopping center on 75th Street to Beverly Boulevard. <br />I <br />7. That a landscaped buffer strip of at least 20 feet in width <br />be provided along the east property line, resulting in an <br />effective evergreen screen within-3 to 5 years. <br />The specifics of the landscaping (i.e., height of trees, spacing) <br />will be presented in a detailed landscaping plan for Phase I <br />to be reviewed by the Planning Department. The plan will also <br />include a perspective of the east boundary of the project. <br />i <br />i 8. Prior to initiating construction of the buildings, architectural i <br />plans showing building style, height, and facade material shall <br />be submitted to the Planning Department foi review. <br />j 9. Specifics on the coordinated signing requirements proposed for <br />the shopping center shall also be submitted to the Planning <br />'j Department prior to occupancy. <br />I <br />■*' if and when actual traffic impact warrants it, in sole discretion of the City's <br />I� Engineering Department <br />.q�.� .r�..a 1. 1. a.. .M.� ar1.1 ♦..I.a �.Y n..r r.rn �I .....r.. .��'n .r.n l{rr as l'I/-4�r. .I,N/ rwv rrY...•... •r a. �i .r....r <br />
The URL can be used to link to this page
Your browser does not support the video tag.