Laserfiche WebLink
3. That the following improvements to public right-of-way <br />I take place: <br />a) Evergreen Way: <br />- installation of a temporary traffic signal at the shopping i <br />center entrance on Evergreen Way, approximately 300 feet <br />I south of 75th Street. ** <br />j <br />- Construction of right -turn lane north bound on Evergreen Way <br />at 75th Street intersection (between entrance and 75th Street) <br />- Construction of right -turn only deceleration lane on Evergreen <br />Way south of the entrance to the center. j <br />Installation of curb, gutter, and sidewalk along projects ! <br />i frontage on Evergreen Way <br />Prohibition of truck traffic. at Evergreen Way entrance. <br />b) 75th Street: <br />- Deed 20 feet of right-of-way along the south edge of 75th Street <br />between Evergreen Way and the east property line of the project, <br />a distance of 609 feet. <br />Add a two-way left turn lane on 75th Street the full length <br />of the project's frontage on 75th Street <br />Construct a right -turn curb lane along 75th from Evergreen Way <br />to the east property line of the project. <br />- Installation of curb, gutter, and sidewalks along 75th Street <br />from Evergeeen Way to the east property line of the project. <br />4. That the operation of the shopping center shall be in compliance <br />with Washington State Noise Regulations (WAC 173-60). <br />I5. That spotlightL, floodlights, or any other lighting, along with <br />signs, shall be shielded so as to not produce glare or nuisance <br />into adjacent residential properties or public right-of-way. <br />6. That a pathway for pedestrians be constructed from the northeast <br />corner of the shopping center on 75th Street to Beverly Boulevard. <br />I <br />7. That a landscaped buffer strip of at least 20 feet in width <br />be provided along the east property line, resulting in an <br />effective evergreen screen within-3 to 5 years. <br />The specifics of the landscaping (i.e., height of trees, spacing) <br />will be presented in a detailed landscaping plan for Phase I <br />to be reviewed by the Planning Department. The plan will also <br />include a perspective of the east boundary of the project. <br />i <br />i 8. Prior to initiating construction of the buildings, architectural i <br />plans showing building style, height, and facade material shall <br />be submitted to the Planning Department foi review. <br />j 9. Specifics on the coordinated signing requirements proposed for <br />the shopping center shall also be submitted to the Planning <br />'j Department prior to occupancy. <br />I <br />■*' if and when actual traffic impact warrants it, in sole discretion of the City's <br />I� Engineering Department <br />.q�.� .r�..a 1. 1. a.. .M.� ar1.1 ♦..I.a �.Y n..r r.rn �I .....r.. .��'n .r.n l{rr as l'I/-4�r. .I,N/ rwv rrY...•... •r a. �i .r....r <br />