Laserfiche WebLink
City of Everett <br />Improvement Plan Checklist <br />---F,vAa 5,435 9- 9-Y6 <br />Checklist Prepared By Date <br />Street an n Storm Drain Improvements (I) <br />Plat or Project CASCADE 590aP:ut C£nn�R� �t Hass 2G <br />North Arrow <br />Scale indicated (vertical and horizontal) <br />/ 1"=40' horizontal and 1"=5' vertical, minimum <br />✓ Names on all streets, centerline shown <br />✓ Indicate Right -of -Way and improvement Widths <br />Indicate existing improvements with dashed lines <br />Show new improvements to be constructed with solid lines <br />Indicate all existing pipe lines, utilities, power poles, etc. <br />address all conflict points and indicate their disposition and by whom <br />Nam_ Show centerline stationing (stationing is to run left to right) <br />Q A-_ Indicate stationing for all beginning of curb returns (BCR's) <br />and ends of curb returns (ECR's) and BC's and EC's of all <br />centerline curves. <br />MA, Indicate curve data on plans for centerline curves and curb returns <br />(Delta, Tangent, Radius, Length) <br />NR Indicate stationing at beginning and end of improvement work. <br />RA Indicate Top Curb (TC) elevations at all BCR's and ECR's and at <br />ends of existing curb and gutter that is being joined or matched <br />with new improvements. <br />_ Pavement flares tc transition from existing E.P. to new improvements <br />are to be shown at 2:1 incoming and 5:1 outgoing. <br />VJA, Asphalt concrete transition ramps are to be shown at ends of new <br />sidewalk sections where sidewalk does not exist. <br />Indicate drainage patterns at both ends of new improvements and <br />work needed to insure existing drainage is not blocked. <br />