Laserfiche WebLink
TO! <br />Bob Landlrs � <br />FROM <br />W. O. 1 0 <br />J. 0"Conner <br />DATE <br />June 19, 1978 <br />SUBJECT CITE OF EVERETT. EVERETT, WASMINGTON <br />Preliminary Draft EIS <br />Reininga Corporation <br />75th St. - East of Evergreen Way <br />Drainage <br />The statement on page 9, that "The Pigeon Creek. Master Plan currently before th= <br />City Council for approval will provide retention facilities," is misleading and erroneous. <br />No funds have been provided by City for design or construction of detention facilities in <br />Pigeon Creek.. There is no reason to believe that any such funds will be provided during <br />1978. <br />n prerequisite to development of this site will be compliance with the existing drain- <br />age ordinance. This means preparation of a drainage plan which can be approved by the <br />Engineering Department, the reference to working "closely with the City Staff — to pro- <br />vide temporary retention basins" should nat be deleted. The City Staff does not prepare <br />the drainage plain either, wholly or in part. The drainage plan will not be affected by <br />any future proposals for detention basins in Pigeon Creek. <br />The whole paragraph under "water" - pg. g, should be deleted and replace with some- <br />thing like,"The control of storra water run-off from the site to the Pigeon Creek basin <br />will be as specified in the drainage plan approved by the Engineering Department of the <br />City of Everett and conforming to the requirements of the drainage ordinance in the Everett <br />Municipal Code," <br />