My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7909 EVERGREEN WAY 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7909
>
7909 EVERGREEN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 3:48:05 PM
Creation date
2/10/2017 12:43:25 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7909
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tlovembr.r 19, 1979 <br />Certificate �lo. 7910-4001 <br />Page Tt•�o <br />The topography of tiie site can be described as sloping from the soutin•�est <br />property corner doomiiard to tfie nortfieast. This elevation change is on <br />the order of thirteen feet. Presently the site is vegetated by native <br />underbrusli and up to eigfit inch diameter alder and hemlock trees. <br />PROPOS[D DEVELOPIIEPIT <br />Proposed development for tlie investigated site cal�s for a single story <br />restaurant facility. Access to tlie site oiill be provided fron Evr_r,reen <br />lday with patron parking and general landsca��ing associated t�iitli the de- <br />velopment. <br />FI[LD EXPLORATOI:Y OPERATIU�IS <br />To establish subsurface conditions, a bacl;lioe �•�as moved to the site on <br />the 16t1i of NQvember. After some preliminary liand borings on site to- <br />gether tiith detailed subsurface inforniation froin test borings ncar tlie <br />site, it �•�as decided that backhoe test pits vrould properly confirm the <br />anticipated subsurface conditions. Tl�is metliod vrould alleviate tlie <br />necessity of large scale clearing to provide access for a truck-mounted <br />drilling unit. A teleplione conversation viitii James I:ent on tiie 15tfi of <br />November confirnied this decision. <br />Test pi�t locations were chosen to best represent the subsurface condi- <br />cions over the �•ihole site and especially in the area of the proposed <br />building. At tl�e tiiae of the investigation, the site plan slio�ied the <br />property extending 200 feet froin Ever9reen llay. Tlie site plan �-ras later <br />PAUFIC �E5T�4G :A;10�.\IOA <br />
The URL can be used to link to this page
Your browser does not support the video tag.