My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8120 EVERGREEN WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
8120
>
BASE FILE
>
8120 EVERGREEN WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 1:12:57 PM
Creation date
2/10/2017 12:53:59 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8120
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30. Trash Collection - Dumpsters over 1.5 cubic yards capacity shall be located a <br />minimum of 5 feet from the buildir,g fUFC 1103.2.2, 1997 Edition]. <br />GENERAL INFORMATION <br />Puget Sou�d Energy is the natural gas provide in ihis area. To initiate new service <br />orders, please contact Marilyn Davis Westlund at (425) 356-7512 at least 90 days <br />prior to the required in-service date. <br />Any relocation of existing gas racilities for this development will be at the <br />developer's sole expense, and requires 90 days minimum notice. PleasP co�itact <br />�laine Babby at (206) 224-2018 to coordlnate relocation requests. <br />2. The Snohomish Caur�ty PUD currently has sufficient capacity to serve the <br />proposed development. For furthe� information about ihe electrical service <br />requirements for this project, please call Kuri Martin of the District's Customer <br />Engineering Office, Everett at 258-8291. <br />3. Verizon fJorthwest has facilities near this location. However, any build�ng <br />�ntrances must be coordinated a± least 60 days in advance. The cost of any <br />relocation of Verizon facilities that is required to construct the new aoartments will <br />be at the total expense of the clev�loper. Any relocation will take 60 to 120 days. <br />Please coniaci Mike !-lupf, Engineer at (425) 356-•4052 or Mil<e Bly, Fngineer at <br />(42b)356-4034 if you have any questions regarding this building entr2.nce. <br />4. Verizon Nolhwest will provide service to ihe site. However, new talephone cable <br />construction will be required in conjunction wiih the site developmenf. Verizon's <br />engineering will begin when they are notified of your con�truction schedules and <br />telephona requirements. <br />5. It �vill be the developer's responsibility to provide a suitable combination of conduit <br />and t�enching and/c?r riser conduii to accommodate Verizon's netwark <br />communications cable within the complex. f'rovided that an acceptable <br />combination of conduit and/or trenching is incorporated into the project to <br />accom� nodate Verizon's en!rance cable, there will be no costs to the developer for <br />Verizon's cable. <br />6. If a rearrangement of existing cables on premises or on the right-of-way is <br />necessary, appropriate charges will be estirr.ated and Verizon's Guararity of <br />Payme; �i torm wili be forwarded to yeu f�r your signa�ure. Prior to commencement <br />of Verizon's engineering for sucfi rearrangement, a deposit will be required. To <br />insure tirnely telephone service, Verizcn requests ninety (90) days lead time for <br />engineering procurement, and ir,stallation of cable and/or Verizon's equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.