Laserfiche WebLink
30. Trash Collection - Dumpsters over 1.5 cubic yards capacity shall be located a <br />minimum of 5 feet from the buildir,g fUFC 1103.2.2, 1997 Edition]. <br />GENERAL INFORMATION <br />Puget Sou�d Energy is the natural gas provide in ihis area. To initiate new service <br />orders, please contact Marilyn Davis Westlund at (425) 356-7512 at least 90 days <br />prior to the required in-service date. <br />Any relocation of existing gas racilities for this development will be at the <br />developer's sole expense, and requires 90 days minimum notice. PleasP co�itact <br />�laine Babby at (206) 224-2018 to coordlnate relocation requests. <br />2. The Snohomish Caur�ty PUD currently has sufficient capacity to serve the <br />proposed development. For furthe� information about ihe electrical service <br />requirements for this project, please call Kuri Martin of the District's Customer <br />Engineering Office, Everett at 258-8291. <br />3. Verizon fJorthwest has facilities near this location. However, any build�ng <br />�ntrances must be coordinated a± least 60 days in advance. The cost of any <br />relocation of Verizon facilities that is required to construct the new aoartments will <br />be at the total expense of the clev�loper. Any relocation will take 60 to 120 days. <br />Please coniaci Mike !-lupf, Engineer at (425) 356-•4052 or Mil<e Bly, Fngineer at <br />(42b)356-4034 if you have any questions regarding this building entr2.nce. <br />4. Verizon Nolhwest will provide service to ihe site. However, new talephone cable <br />construction will be required in conjunction wiih the site developmenf. Verizon's <br />engineering will begin when they are notified of your con�truction schedules and <br />telephona requirements. <br />5. It �vill be the developer's responsibility to provide a suitable combination of conduit <br />and t�enching and/c?r riser conduii to accommodate Verizon's netwark <br />communications cable within the complex. f'rovided that an acceptable <br />combination of conduit and/or trenching is incorporated into the project to <br />accom� nodate Verizon's en!rance cable, there will be no costs to the developer for <br />Verizon's cable. <br />6. If a rearrangement of existing cables on premises or on the right-of-way is <br />necessary, appropriate charges will be estirr.ated and Verizon's Guararity of <br />Payme; �i torm wili be forwarded to yeu f�r your signa�ure. Prior to commencement <br />of Verizon's engineering for sucfi rearrangement, a deposit will be required. To <br />insure tirnely telephone service, Verizcn requests ninety (90) days lead time for <br />engineering procurement, and ir,stallation of cable and/or Verizon's equipment. <br />