Laserfiche WebLink
� <br />s <br />� <br />� <br />12. A fire hydrnnt is required within 200 driving :eet but not closer than <br />50 feet of every sturcture. All fire systema ehall be built within the <br />akandarda eetablished by City aad State codes, and muat be approved by <br />:he Fire Department. <br />13. Increased noise will be generated by nutomobile and truck traffic. <br />Operation of the ahopping center muat comply with State �WAC 173-60) <br />aad local Noise Code requiremente (Ordinsnce 0534-78), p report by a <br />certified noise conaultant indicating t.hat mitigation measures• have <br />been taken to inaure compliance with noiae atan�!ards m�et Se aubmitted <br />to and approved by Che City prior to the i3auance of any building <br />permi[s. <br />14. Conetruction of the Everett Mall Village Center muat be coordinated by <br />the applicant vith the Snohomiah County Y.U.D, to insure proviaion of <br />adequate electrical aervice to the development. <br />15. Specifica on the external co�ercial aigning requirements gropoeed Eor <br />the ahopping center ehall be aubmitted to and approved by the Ylanning <br />Department priur to ieauance of occupancy pexmite. <br />16 <br />17. <br />Exterior lighting ehall be designed per I.E.S. q.tandards with the <br />Luminance diatance to minimize light and glare to extent fe:seible on <br />contiguous propertiea. <br />A bus shelter and bue pullout muat be included in design and <br />conatruction of the �project: Location and design muat be approved by <br />the City Traffic Engineer. <br />The Applicnnt ahall agree to provide bus ecnedule/route infozma[ion <br />racks or dieplays at a central location aithin ehe Mal�. <br />The Applicant ahall ::gree to proviJe bicycle racke located in a safe <br />and convenient manner for the use uf both cuetomers and employees, and <br />approved by the City'e Traffic Engineer. <br />J <br />