Laserfiche WebLink
��� <br />m�a <br />9Hxl�i� <br />HZ� <br />�H� <br />� N � <br />V] H <br />�x <br />�ty <br />OH <br />��g <br />�V n <br />t"y� <br />HH <br />gy <br />c�C� <br />� � t+1 <br />z H C� <br />HOcn <br />I �` r� <br />' �� <br />� <br />� <br />/� <br />, ,_, -.,- ; , ; <br />� � <br />INFORPiATION 1�On DEVCLOPER: <br />1 <br />2 <br />3. <br />i.: . <br />Noke that the grass lined swales and parking aisles as indicared in the <br />site plan for SEPA Review do not appear to meet City �esign Standards. <br />Further compliance with City Design Standards will be re�auired. <br />(i) Fire lanes to be provided in compliance with Everett Plunicipal <br />Code 46.44. <br />(11) Pire hydrants must be in service prior to construction. <br />(111) Conetruction activi[ies to be in compliance with Uniform Fire <br />Code, 1985 Edition, Article 87, "Fire Safety During Conatruction" <br />(copy attached). <br />(iv) Apartment premise muet. be identified at street entry, and each <br />building and apartm �is to be clearly identified so as to be <br />visible and legibl r L the accesa roads. <br />\ <br />City streets and alley�are t:o be kept clear of dirt and debris at all <br />times during construction. Uuet suppression and street cleeining must <br />occur as di-ected by the Public Works Inspector. <br />4. The Police Department has the .Eollowing security recommendations: <br />a. The perimeter doors shou�be solid core with 190 degree to 220 <br />degree wide angle viewers ud single cylinder deadbolta with 1" <br />throw and at least 3" qcrewe securing atriker plate. <br />b. Sliding glaes doors should havE Charlie bars installed for <br />optimum security. � <br />5. <br />c. Lighting of the par4;ing lot should be u minimum oE 1-2 foot <br />candles. <br />d. During the final stages of construction, please co¢tact Dick <br />� Thomberry, Cri.me Prevention OPficer, at 259-0416 for further <br />security recommendations. <br />GTE Northwest has facilities ut this location. Any building entrancea <br />muat be coordinated at least 60 daye in advance. GTE Northweat has <br />confirmed they will provide servlces to the propoaed project site. <br />However, new telephone cable conatruction will be required during site <br />development. Your contact at GTE Northwest is Ceorge Zanas ati356-4053'• <br />for this building entrance. <br />6. Any required landacaping provided in the C1ty right-of-way muat be <br />approv�d by the Public Works Department and must be leased from the <br />City� <br />I <br />444d <br />- 4 - <br />0 <br />i: <br />, <br />