My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 SW EVERETT MALL WAY COLPITTS 2016-01-01 MF Import
>
Address Records
>
SW EVERETT MALL WAY
>
15
>
COLPITTS
>
15 SW EVERETT MALL WAY COLPITTS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 9:02:49 PM
Creation date
2/10/2017 2:11:08 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
15
Tenant Name
COLPITTS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar 29 2007 3:36PM HBF#Design#Group 4252522826 p.9 <br />' f <br />42. An approved automat(c suppression systern shell be provided as required by Cfty ordinance No. 1902- <br />92, CFapler 16.76, of the Everett PAunidpal Code. The syslem mu�t inck�do e mechanical watergong <br />hell. <br />Plans for any such system shall be submitted to the Buildir,g Department for examinaGon and epproval. <br />Such plar,s shall Include plans for the underground mains that will eupply the sprirrder system. <br />The type of sprinkler to be installed will be determined by the Building Official. It may be an NFPA 13, <br />NFPA 13R, or NFPA 13D eyatem depending upon several faclws. Sprinkler instaYaGon shall not begin <br />wifhout an approved and slampecl set of plans irom the Buildtng Department The Fire Departrnertl will <br />atso review the plans and shali field inspect the installaVon based mly on approved plans that must be <br />on sile. Changes to plans must be approved by both the Building and Fire DepaAmertts. <br />Aboveground sprinkter piping shall be hydrostatically tested as estnWished in NFPA Standard 13. ' <br />Underground piping shall be hydroslaHcally tested and flushed as established in NFPA Standard 24 for <br />pr'rvate fire mains. (Below-arcund ofpinq must be instelled bv Washinaton State Pahol Licerued <br />i)nderQround Sprinkler line certified "U" installers For turther informatfon, contad the State Flre <br />Marshal's Office at (360) 570�3134 or contact ihe Everett Flre DepaAment at (425) 257-8125). All such <br />tests shatl be wifiessed by a Fire Department inspectnr. Call (425) 257-8124 to make an appoinlment <br />forinspecGon. <br />Contractors' matarials and test certificates shall be su6mitted to the Everett Fire Department prior to <br />issuance of any Certiflcates oF Occupancy. <br />Call (425) 2SI-8125 for more infortnatian. <br />A3. Construction and demolitlon uf buildings shall ba (n compliancs with the provisions of the 2003 <br />Internalbnal Fire Code, Chapter'14. <br />44. Permits are required from the Fre Department for removal and instailation oi underground fuel tanka. <br />45. All fire alarm control panels (FACP) and sprinkier �alves shall be In heated rooms or closets with <br />standard man door access. Locations shall be approved by lhe Fire Marshal's Otfice. <br />Ii the men door access is not directly from the outside, then a PIV is required. An FDC is required, <br />location to be dete�mined by the F�e Marshal. A water motorgong is7equired,with the instaqaQon of an <br />NPPA �3 sy�tem. <br />46. Dumpsters over 1.5 cubic yards eapacity shall be tocaled a minimum oT 5 ieet from 1he buitding. <br />gd <br />
The URL can be used to link to this page
Your browser does not support the video tag.