My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
510 SW EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
SW EVERETT MALL WAY
>
510
>
BASE FILE
>
510 SW EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2019 3:50:06 PM
Creation date
2/10/2017 2:46:18 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
510
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � <br />- BOSS & MAYES <br />TESTING ENGINEERS, INC. <br />CIltCiJIT CITY - EVERETT <br />Circuit City <br />Page 25 <br />ERMIT # B-46679 <br />6-15-95 <br />INSPECTION REPORTS <br />JOB # 03895 <br />This inspector performed a preliminary walkover inspection of the applied Malarkey 3-ply <br />fiberglass/aspbalt built-up roof inembrane on the above noted building. We understand that <br />additional mechanical or electrical penetrations have been made recently. The following "punch <br />list" items werc noted: At the roof top unit, grid E-5 (MIC EF-6), there is an electrical <br />penetration (lead pipe) that need: to be sealed off at it's top, and along grid line D, there aze <br />seven of them needing the same work, and one new lead pipe flashing at the satellite dish <br />mounting mast needs tn be completely flashed to the roof inembrane. And at grid C-2 there aze <br />2 more elec. pems. that aze not sealed at the top of the pipe top. <br />At the primary drain at grid E-2, there aze two slit downs in the cap sheet that should have <br />some fibered roof cement worked into them. <br />There are two side lap seams in the cap sheet work that aze loose, needing cementing, at <br />about grid D.5-1 to 1.5, starGing at the north wall count seams out to seazns #14 and 15. <br />Regazding the ponding water at the grid C-5 drains, please refer to the attached copy of a <br />page from the Malazkey manual titled "General Specificarion Requirements", pazagraph no. B.9: <br />drainage,last sentence. <br />Based on the Malazkey specification, it appeazs that the ponding water may affect the <br />wazranty. Clarification from the manufacturer is required. Please contact our office upon <br />completion for a final inspection. <br />INSPECTGR: Phil Stevens <br />7-12-95 <br />This inspector performed a walkover inspection of the building roof as a follow up to the <br />report dated 6-15-95, noring repairs and/or work needing complerion on the built-up roofing <br />system. <br />Found all items noted in that report completed. <br />INSPECTOR: Phil Stevens <br />917 - 134th St. S.W., Suite A-1 • Everett, WA 98204 •(206) 742-9360 • FAX (206) 745-1737 <br />
The URL can be used to link to this page
Your browser does not support the video tag.