My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
510 SW EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
SW EVERETT MALL WAY
>
510
>
BASE FILE
>
510 SW EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2019 3:50:06 PM
Creation date
2/10/2017 2:46:18 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
510
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��1- 'v-:tc G14�Ie1YlTf4�O 7elfiT f{'�>�)trcwp� �Yocc��1�+'co4i- o�i 6�eCrwck�-- <br />t�aNeYl'��/tTIG.1 FioWr 11j�"c.6fY 141�'��+ ILsGEh7'v�(. ��C %vuA411vf7 �r���1eG4E UJT <br />' � I'F c �1 Hc�ic h�7af�. <br />- 6055 & MAYES <br />TESTING ENGINEERS, INC. <br />CIRCLTIT CITY - EVERETT <br />Circuit City <br />Page 25 <br />pgRMIT # B-46679 <br />INSPECTION REPORTS <br />JOB # 03895 <br />6-15-95 ���u N u� A+�� <br />This inspector performed a Jwalkover inspection of the app ed Malaz��P� <br />fiberglass/asphalt built-up roof inembrane on the above noted building, ���L_� �� <br />', d <br />azea or wor � <br />' gt the roof top unit, grid E-5 (MIC EF-6), there is an electrical <br />penetration (lead pipe) <br />that, needs to be sealed off at it's wp, and along grid line D, there aze <br />seven of them needing the same work, and one new lead pipe flashing at the satellite dish <br />mounting mast needs to be completely flashed to the roof inembrane. And at grid C-2 there aze <br />2 more elec. pems. that aze not sealed at the top of the pipe top. <br />At the primary drain at grid E-2, there aze two slit downs in the cap sheet that should have <br />some fibered roof cement worked into them. <br />There aze two side lap �eams in the cap sheet work that aze loose, needing cemenring, at <br />about grid D.5-1 to 1.5, starting at the north wall count seams out to seams #14 and 15. <br />Regarding the ponding water at the grid C-5 drains, please refer to the attached copy of a <br />page from the Malazkey manual ritled "General Specification Requirements", pazagraph no. B.9: <br />drainage, last sentence. aces be re 'red y fill' g <br />T�is inspector, if asked, woul c mmend that th W P p r res 'vel <br />them/with a few l en apsheet ma al la ed/set into f red roo cement using p g Y <br />,. ..l �o�,;��� e e is a buil p of a ut i/2". en the in ecrio as done, re was <br />of n the n� <br />t cut the e shn oof inembr <br />��1 At. A�LG E `t <br />�A'eo oa trl� "", <br />14rY�( ,kFFec.r <br />5 �,������,,a INSPECTOR: Phil Stevens <br />�r �-.���k� i-A�kT ��� �ok(J/4y wµT�� <br />,r,r�.� �,.,ipa�LA..�' <br />G� p,.�r-+c arc�! <br />IS Qo4tutitZ'�• �t�ih1 i CP�•.7�FcT p•a�t pP�G6 <br />�� �p,. Y/NfiC. IHJ%.ti.'ilo.{. <br />FiatK tt� Ml�nntfhCWlZt+l <br />N!''rt NM�C.�� <br />917 - 134th St. S.W., Suite A-1 • Everett, WA 98204 •(206) 742-9360 • FAX (206) 745-1737 <br />
The URL can be used to link to this page
Your browser does not support the video tag.