Laserfiche WebLink
GENERAL INFORMATION <br />The Snohomish County PUD currently has sufficient capacity to serve the proposed <br />development. For information about the electrical service requirements for this project, <br />please call Mike Tumpaw of the District's Customer Engineering Office, Everett at <br />258-8282. <br />2. GTE Northwest Incorporated will provide service to the site. However, new telephone <br />cable construction will be required in conjunction with the site development. GTE's <br />engineering will begin when they are notified of your construction schedules and <br />telephone requirements. <br />If a rearrangement of existing cables on premise or on the right-of-way is necessary, <br />appropriate charges will be estimated and GTE's Guaranty of Payment form will be <br />forwarded to you for your signature. Prior to commencement of GTE's engineering for <br />such rearrangement, a deposit wii; be required. To insure timely telephone service, GTE <br />requests ninety (90) days lead time for engineering, procurement, and installation of <br />cable and/or GTE's equipment. <br />Please contact Michael Hupf, Senior Engineer, at 356-4052 should you require additional <br />information. <br />