Laserfiche WebLink
Meg Haley <br />From: Mike Smith [MichaelP@pacengtech.com] <br />Sent: Sunday, September 18, 2011 5:40 PM <br />To: Meg Haley <br />Cc: Ryan Miletich; ernest Frederickson; Gombasy, George; Jan Bredal <br />Subject: Everett Floral Site Meeting - City of Everett <br />Ms, Haley: <br />Thank you again for setting up the meeting on Friday (9/16) to discuss the Everett Floral Project located at 4522 <br />Evergreen Way (Permit No. 1109026). 1 think we made some headway. You have a set of drawings in for review, but I <br />think it prudent that we continue with construction details. I will need to get you structural calculations as we move on as <br />well. As requested by the Planning Department, we ar? also continuing with completing the survey. I will be sending a <br />plan over to Michael Brick at Traffic as well for his input on the parking requirements. <br />As discussed at the meeting, I would like to set up a site visit for Thursday morning (9/22). 1 believe you suggested an <br />8:30 meeting. Please confirm the date and time as soon as you are able. I will be on the road most of Monday/Tuesday, <br />but I check email quite often. (I have included the owner, his contractor, the insurance adjuster, and our architect on this <br />email.) <br />Thank you again. <br />mps <br />Michael P. Smith, P.E., S.E. <br />Principal <br />Pacific Engineering Technologies, Inc. <br />1700 Westlake Avenue N., Suite 100 <br />Seattle, Washington 98109 <br />206.281.7500 <br />206.281.4611 (f) <br />m ichaelp(a)pacengtech.com <br />