Laserfiche WebLink
4. There are some additional minor comments added to notes where more clarification <br />could provide more assistance. These types of changes are clouded. <br />5. When we found a section cut oriented in the opposite direction, we changed the <br />arrow. These types of changes may not be highlighted or clouded. <br />CLOUDEDITEMS <br />Note that all modifications made to the drawings as a part of our responses and the additional <br />modifications noted above have been clouded as Revision 2: Building Department Revision <br />and dated November 10, 2611. Please note that all of the drawings prepared by Pacific <br />Engineering Technologies, Inc. have been modified. The survey, submitted with the original <br />drawings, has not been modified. <br />Previous Revision 1: Building Department Revisions dated October 27, 2011 were prepared <br />to meet the modifications for the Landscaping requirements set forth by the Planning <br />Department. Those revisions are still clouded as Revision 1 on the PROPOSED PARKING AND <br />LANDSCAPING PLAN on Sheet 1 and include r,ew potted trees in the southeastern portion of <br />the site and a new curbed -in landscaping area with shrubs in the northeastern portion of the <br />site. <br />Please call if you have any questions or require additional information. <br />Sincerely, <br />PACIFIC ENGINEERING TECHNOLOGIES, INC. <br />Ichael P. Smith, P.E., S.E. <br />Principal <br />RVD: JAB <br />Enclosures: Additional Structural Calculations <br />cc: Mr. Ernie Frederickson, Owner (letter & pdf of drawings only) <br />Mr. Ryan Miletich, Tersuli Construction Services (letter & pdf of drawings only) <br />Mr. George Gombasy, Liberty Northwest (letter & pdf of drawings only) <br />11220Cart N01Rspnll-10-Il.d" 11/10/11 <br />