Laserfiche WebLink
Participation in a future voluntary employee carpool program is <br /> required. <br /> 9. A fire hydrant is required within 200 driving feet but not closer than <br /> 50 feet of every struc[ure. AL1 fire systems shall be built vithin the <br /> standards established by City and State codes, and must be approved by <br /> [he Fire Department. <br /> 10. Spe�ifi�s on the external commerical signing requirements proposed for <br /> the shopping center sha11 be submitted to and approved by the Planning <br /> Department prior to issuance of occupancy permits. <br /> 11. Exterior lighting shall be designed per I.E.S. standards with the <br /> luminance distance to minimize light and glare to extent feasible on <br /> contiguous properties. <br /> 12. Construction of the shopping center must be coordinated by the <br /> applicant with the Si.ohomish County P.U.D. and General Telephone to ' <br /> insure provision of adequate electiical and telephone service to the 'i <br /> development. <br /> I <br /> 13. Increased noise will be generated by automobile and truck traffic. I <br /> Operation of the shopping center muat comply vith State (WAC 173-60i , <br /> and Local Nai�e Code requirements (Ordinance �k534-78). � <br /> 14. Truck loading and unloading areas adjacent to the residential uaes to I� <br /> the northeaet of the shopping center sha�.l be designed with enclosed <br /> loading docka: Aalls of the loading aacks shall be sufficient to � <br /> reduce noiae to meet Noise Code requirements. ' <br /> 15. Landscaping of parking areas muet be provided in compliance vith Zoning. li <br /> Code requirementa (Section 19.40.050) and the City's Design and <br /> Construction Standarda and Specification (Section 1.13) . Screening of j <br /> all rubbiah dispoeal areae is required. i <br /> A detailed landacaping plan muat be approved by the Planning Department <br /> prior to the ieauance of building permits. Cccupancy permits shall not <br /> be issued until required landacaping is inatalled or bonded ,'•or. <br /> 16. Phasing of the project conatruction is noc propoaed at this time. Any <br /> proposed phaeiag of requirements included herein must be approved by , <br /> the Planning Department. <br /> Construction muet occur during the hours of 7:00 A.M. and 7:00 P.M. ; <br /> during conatruction City streets are to be kept clear of dirt and 'I <br /> debris, and all truck traffic to and from the site within the City of <br /> Everett shall be on arterial street unlesa otherwise approved by the II <br /> Public Works Department. <br /> INFORMATION FOR DEVELOPER: <br /> 1 . ' Performance guarantees are required For all improvement in thc <br /> right-of-way, storm drainage and landscaping. ! I <br /> 2. A one (1) year guarantan is required on tha public improvement and I ' <br /> landscaping for an amount not less than lOx oE the cost of construction <br /> and shall run for one (1) yeat from date of issuance of the first � <br /> Occupancy Permi[ for the project. <br /> I <br /> i <br />