My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10630 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
10630
>
BASE FILE
>
10630 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2017 9:27:08 AM
Creation date
2/10/2017 9:26:44 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10630
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engincering Report <br /> , Proposed New Storm Watcr Vault <br /> Northwest Mitsubishi <br /> November 18, 2002 <br /> CG File No. 1397 <br /> Pagc 2 <br /> maximum water storage planned in the vau]t. Water will bc rcleased 1'rom the vault into an open <br /> treatment cell planned on thc west side of the vault. "I'hc water will flow through the treatment <br /> cell to an intake with a trash rack and then be routed into the existing manhole. A roughly 4-foot- <br /> high concrete retaining wall is shown along thc west side of the treatment cell near the west <br /> property line. The DEA plan appeared to indicate that the wall would be located about 5 feet <br /> from the praperty line and 9 feet Gom the vault. <br /> We understand that thc arca around the new vault will be filled and lhe surface covered with <br /> 6Ravel for additional parking area. Mr. Greg Gliege with Project Services, your contractor on the <br /> project, indicatcd he expects to werk on the site this wintec I le said a temporary diversion of thc <br /> water currently ilowing through the planned vault area will be in place prior to bcginning the <br /> excavation. Ile expects to stockpile some of the excavated material for use as backfill and export <br /> wet material that cannot be stockpilcd duc to high moisturc or that contains excessive organics for <br /> use as backfill. Greg indicateJ that imported soil, most likely glacial [ill from a nearby project, <br /> will bc brought in to providc cnaugh soil for thc planned backfill and parking cxpansion. <br /> 7'hc top of thc slab at ihe basc of thc vault is planned at Elcvation G32.4 fcet. Based on the <br /> drawings provided, �+�e estimatc that the bottom of the footings is planned at about elevation 63l <br /> fcet. <br /> SCOPE <br /> The purposc of this study is to explorc anJ characterize the subsurfacc conditions, and present <br /> recomniendations for site devclopment. Specifically, our scope of services will include the <br /> follo�+�ing: <br /> L G��aluate the subsurface conditions with a backhoe. The backhoe will be provided <br /> by your cantractor. <br /> 2. Provide foundation and retaining wall recommendations. <br /> 3. Provide general surface and subsin face drainage recommendations. <br /> �l. Prcpare a gcotechnical report summarizing our cone;usions and recommendations. <br /> Cornerstone Geotechnical, Inc. � <br />
The URL can be used to link to this page
Your browser does not support the video tag.