Laserfiche WebLink
, <br /> If fencing is required due to the above criteria, the <br /> location of the fencinq and appropriate gates must be shown <br /> on the plans. To meet City standards, the fence must be 6� <br /> high. <br /> The following note regarding pond berm materials on the <br /> plans muet be included on the plans: <br /> NOTE: Berm soils shall consist cf material conforminq <br /> to the followinq gradation: <br /> Sieve Size � Passing , <br /> ' 3�� 10 0 <br /> �4 65-90 <br /> #`200 12-20 <br /> The following notes regarding construction of the wetpond <br /> treatment cell, and the topsoil specification, must be <br /> included in a conspicuous place on both the storm drainage <br /> plans and the landscape plans: <br /> CONBTRQCTION OF WETPOND TREATMENT CELL <br /> Over-excavate the wetpond treatment cell by a minimum of 6 <br /> inches as compared to final grade. Immediately after it has <br /> been graded, rouqhen the bottom and sides of the treatment <br /> cell by rakinq and place topsoil (a minimum of 6 inches) to <br /> bring the bottom elevation to final design grade. <br /> Sod the treatment cell immediately after the topsoil has <br /> been placed. Lay sod to a minimum o€ i.o feet of vertical <br /> depth above the bottom of the treatment cell. Lay the sod <br /> pieces with their long axis perpendicular to the direction <br /> of flow in the cell and stagger the pieces to avoid a <br /> continuous longitudinal seam in the bottom of the cell. <br /> To plant the required wetland vegetation, punch holes in the <br /> sod with a bar or stake approximately equivalent to the <br /> diameter of the plants� root wads. Insert the plants in the <br /> holes and tamp the sod and earth down around the plants. <br /> Locate the plants in the bottom of the treatment cell only <br /> and in a staggered pattern - not in a straight line. <br /> O • Topsoil sha13., at a minimum, meet the standard for <br /> Topsoil Type A, as specified in section 9-14.1(1) of the i <br /> 1991 Standard Specifications for Road, Bridge, and Municipal <br /> Conatruction (WSDOT, APWA) with the following modification - <br /> 100$ of the topsoil shall pass through a 1/2" sieve. <br />