My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11102 EVERGREEN WAY 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
11102
>
11102 EVERGREEN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2018 7:37:56 AM
Creation date
2/10/2017 10:38:05 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
11102
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil Tvos A - excerpts from WSDOT, APWA std 9-14 .1(1) <br /> with City modification. <br /> Topsoil shall be Pree from materials toxic to plant growth, <br /> noxious weeds, rhizomes, roots, subsoil, stones, and other <br /> debris. 100$ of the topsoil shall pass through a 1/2 inch <br /> sieve. <br /> Topsuil Type A ehall consist of a sandy clay loam, sandy <br /> loam, loam, clay loam, silty clay loam, or silt loam soil. <br /> The mix may not be more than 50$ sand nor 208 clay. Total <br /> organic matter shall be 1$ to 10�. A maximum of 20� of the <br /> mix volume may be ratained on a 1/4" sieve. <br /> Flow aontrol struatur� (reatriator abl : <br /> The flow control structure must be accessible for <br /> maintenance. A 15' wide all weather surface access road is <br /> required to be constructed to the control structure. <br /> The top of the flow control structure should not be centered <br /> in the middle of the access road. It should be off-center <br /> to the right as the vactor truck pulls up to the structure. <br /> A detail of the flow control structure must be provided in <br /> the plans. <br /> All orifice sizes and their elevations, as well as the <br /> overflow elevation, must be clearly shown on the detail of <br /> the control structure. <br /> aradinq: <br /> A plan for restoration of any wetland areas that will be <br /> disturbed by the construction of stormwater facilities (e.q. <br /> swales, wetpond, storm drains, etc. ) will be required to be <br /> approved by the Planning Department prior to the <br /> disturbance. <br /> The proposed topographical contours for the site, as well as <br /> the existing contours, must be shown, especially in swa,le <br /> and wetpond areas. <br /> oil/Mater saparator: <br /> The inlet and outlet elevations of the separator, the � <br /> elevation of the bottom of the separator, and the position <br /> and height of interior baffles should be clearly shown on <br /> the vault detail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.