My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11102 EVERGREEN WAY 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
11102
>
11102 EVERGREEN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2018 7:37:56 AM
Creation date
2/10/2017 10:38:05 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
11102
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manhole Type I - 48�� (standard plan �605A) - maximum <br /> hole size of 36° <br /> Manhole Type I - 54'� (standard plan �605A) - maximum <br /> hole size of 42" <br /> City standards call for all type II catch basins and <br /> manholes to be equipped with ladders per standard plan f6o6, <br /> in addition, all type II catch basins and manholes with <br /> "catches" are required to have lockinq lids. These <br /> requirements should be indicated on the plans, either <br /> specifically for each structure of this type or as a general <br /> note. <br /> A catch basin or manhole is required at all changes in storm <br /> drain diameters, grade or alignment. <br /> Open inlet pipes 12" or greater should be equipped with a <br /> trash rack. <br /> Catch basins instead of inlets are preferred in the public <br /> right-of-way. <br /> The main storm drain in the public right-of-way muat be a <br /> minimum of 12�� in diameter. <br /> Five horizontal feet, or one horizontal foot for every foot <br /> of vertical difference in elevation, whichever is larqest, <br /> must exist between utility lines. <br /> �iscellaneous• <br /> All rockeries or retaining walls greater than 4 feet high <br /> must be structurally designed and the structural design must <br /> be submitted to the City for review by the City�s structural <br /> engineer. <br /> The required notes from section 4.4.2. 1 (notes requireci on <br /> plans) must be included on these plans. <br /> When perforated pipe is called out, the type of pipe, size <br /> of perforations and spacing of perforations must be called <br /> out. <br /> The top and toe elevations of all rockeries adjacent to or <br /> associated with stormwater facilities must be given. � <br />
The URL can be used to link to this page
Your browser does not support the video tag.