Laserfiche WebLink
., � � �u C� <br /> surroundinQ exterior walls shall be the usable area under the horizontal projection of the <br /> roof or floor above." Since each building is compietely surrounded by exterior walla, per <br /> the above definition, we wunted floor area to the exterior walis only and not including the <br /> area under the overhangs. Therefore we comply with City Ordinance 1902-92 and do not <br /> nced to sprinkler the buildings <br /> 2.) Group M occupancies over 3,000 aquare ket a6ai1 be equipped with an <br /> automatic fire detation system (firc alrrm aystem) per City Ordinnnce 1902-92. <br /> We have indicated this under the G,>de Data on Sheet AO <br /> 3.) Plase provide parking lot lighting layout and lighting power allowance <br /> calculation�. <br /> This information will be arziving separately from Gus Boutsinis <br /> 4.) Plase indicate attic draftaops per Sectioa 708.3.1.2.2. <br /> Refer to the Retlected Ceiling Plans for t6is infomiation on Sheets A2.0, A2.1, A2.2, A2.3 <br /> and A2.4. <br /> 5.) Pleaae indicate roof access. <br /> Access to the roof will be by ladder. Due to security no permanently mounted ladder will <br /> be provided. Since this is a one story building, access by a portable ladder will be a simple <br /> matter. <br /> 6.) Pleaae indicate e:it signage aod lighting per Section 1012 and 1013. <br /> Refer to the Reflected Ceiling Plans for this information on Sheets A2.0, A2.1, A2.2, A23 <br /> and A2.4. <br /> 7.) Handrail e:tensions on accessible ramps must eztend on both handrails. <br /> Refer to the note on the Site Plan Sheet Al. <br /> S.) Please provide details of how the area aeparation wail continues through the <br /> concealed canopy arws. Section 504.6.3. <br /> Refer to Detail 7/A5.1. <br /> 9.) Pleaae indicate canopy access openings. Sectioo 1505.1 <br /> Refer to the Reflected Ceiling Plans for this information on Sheets A2.0, A2.1, A2.2, A2.3 <br /> and A2.4. <br /> 10.) Required parapets must have non-combustible facings on the upper 18 iacha <br /> of the parapet. Section 709.4.2. <br /> Refer to revised details 2/A5.0 and 6/A5.0. <br /> 11.) Detail5 Sheet AS.1 indicates the gypaum wdlboard atopa at the plywood roof <br /> aheathing. The gypsum wallboard must be continuous froro top to bottom of area <br /> separation wails. Please note the intent of an arex separation wall ia to create lwo <br />