Laserfiche WebLink
Subject: Proposed, Zab Thai Restaurant, 11108 Evergreen Way, Everett <br /> August 3, 2006 <br /> Page 2 <br /> 12. Plumbing must meet state and local codes. <br /> 13. The ventilation system shall be installed and operated to meet applicable building, mechanical, and <br /> fire codes. <br /> A preoperational inspection is required prior to operating permit issuance and approval to open <br /> for business. At the time of inspection the construction of die food service establishment must be <br /> complete and all equipment must be in place and in proper operating condition. Incomplete construction <br /> or equipment operation may result in a $153.00 reinspection fee. Requests for a preoperational <br /> inspectioo must be received at least one week in advance of the date being requested for the <br /> inspecNon. Contact the Food Program oftice a minimum of one week in advance to schedule an <br /> appointment for the preoperational inspection. T'he preoperational inspection will ensure compliance <br /> �iith the Rules and R�ulations of the State Boazd of Health for Food Service Sanitation. <br /> Changes or additions to the approved plans or equipment require pre-approval from the Snohomish <br /> Health District prior to implementation of the chang�s. <br /> Please contact me if you have any questions. My office number is 425339.5250. <br /> Sinc <br /> Robert A. Ho .S. <br /> Environmen ealth Specialist <br /> RH/sm <br /> Enclosure: Pood Service Establishment Operating Permit Applicatioi.and Fee Schedule <br /> cc: City of Everett Building Department <br /> Everett Office Washington State Liquor Control Boazd <br /> Sudarat'fiachazoenwat, Owner <br /> �\� <br />