My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/06/15 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/06/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 2:25:37 PM
Creation date
2/10/2017 11:05:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/15/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
901
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />FINAL CONTRACT VOUCHER CERTIFICATION J� <br />CONTRACTOR: Pacific Crest Construction ADDRESS: 13619 Mukilteo Speedway <br />CITY: Lynnwood STATE: WA 98037 DATE: May 19, 2005 <br />PROJECT TITLE: Effluent Transfer — Pump Station WORK ORDER NO. UP2880A <br />DATE WORK COMPLETE: May 11, 2005 FINAL AMOUNT: $ 2,228,112.78 <br />CONTRACTOR'S CERTIFICATION <br />I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br />and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br />authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br />employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br />monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br />understand e sa�. and that I hereby release the City of Everett from any and all claims of whatsoever nature <br />which I hasird out of the performance of said contract, which are not set forth in said estimate_ <br />X X ��Eslo <br />CONTRACTOR TITLE <br />Pacific Crest Construction <br />S 'bed an .= to before _ <br />et his <br />otary Public <br />in ands RY� e o gas V gton, residing at��((; Olds S f�GTF%lt <br />23 *,# PUBLIC WORKS DEPARTMENT CERTIFICATION <br />OF <br />�/f/H111111111\\\\\` <br />I Certify the attached final APPROVED Date: <br />estimate to be based upon actual <br />measurements and to be true and correct. <br />X g 7 X <br />Construction Manager Utilities Director <br />Tom Fuchs Tom Thetford <br />INSTRUCTIONS <br />The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br />agents and forwarded with the Final Contract Voucher Certification. <br />Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br />attached. <br />Revised 9/94 <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.