Laserfiche WebLink
Run Date: 5/16/2005 City of Everett - Public Works Department P Cutoff Date: 5/13/2005 <br />Time: 8:54 AM <br />Contract Estimate Voucher <br />Project: 157 For Work Order #2880A Contractor: PACIFIC CREST CONSTRUCTION <br />Effluent Transfer -Pump Station Estimate #21 13619 MUKILTEO SPEEDWAY <br />WO 2880A BID: $2,232,425.85 LYNNWOOD WA 98037 <br />TOTAL BID: $2,232,425.85 - Ul <br />rya <br />Total Amt Previous Amt Present Amt <br />Contract Totals to Date $2,228,1 12.78 $2,228,112.78 $0.00 <br />Retained Amounts $111,405.64 $111,405.64 $0.00 PIN44Z <br />State Tax Amounts $0.00 <br />$184,971.65 $184,971.65 <br />Amounts Paid $2,301,678.79 2,301,678.79 <br />Amount to be Paid This Estimate $0.00 <br />Checked By <br />Recommended By <br />Public 'Works Director <br />RECORD DRAWING CHECKOFF <br />0"- Ny s N hv� 3�En T��s (�D Iv1.) <br />Work Order Number: 2880A In$~ Dal <br />Contractor. Oa <br />Date <br />Date <br />Date Z %T OD <br />