Laserfiche WebLink
• <br /> 6 <br /> Exclusions: The following items are not considered part of the scope of work. <br /> 1. Coffman will not issue the drawings for bid. <br /> 2. Coffman will not facilitate or attend a pre-bid meeting. <br /> 3. Coffman will not review contractor proposals or participate in the evaluation <br /> of bids from the qualified contractors. <br /> 4. Coffman will not review the contractor's schedule of values or requests for <br /> payment based on the percentage of completed work. <br /> 5. Coffman will not provide commissioning. (The witnessing and <br /> documentation of the building systems verification process,beyond <br /> contractor test& acceptance) <br /> 6. Coffman will not process the contractor's field markups and record changes <br /> in AutoCAD. <br /> 7. Coffman will not provide redesign and systems upgrades. <br /> 8. Coffman will not provide additional site visits,meeting, and continued <br /> construction administration beyond the scope of work stated above. <br /> Reimbursable Expenses: <br /> Reimbursable Expenses shall include travel expenses and meals, printing,long- <br /> distance telephone, and other reimbursable expenses as defined in AIA <br /> Document C141 Standard Form of Agreement, latest edition. Reimbursable <br /> expenses will be billed at cost, plus 10 percent for handling. <br /> 2. Paragraph 4(D) is modified to read as follows: <br /> Total compensation, including all services and expenses, shall not exceed a <br /> maximum of Forty Five Thousand Two Hundred Dollars ($45,200.00). <br /> 3. Compensation shall be described as follows: <br /> Generator Power Feasibility Study -Completed May 29, 2003 -$8,167.00 <br /> South Precinct EOC Phase 1 - Completed September 11,2003-$9,000.00 <br /> South Precinct EOC Phase 2- Construction Documents-$18,034.00 <br /> South Precinct EOC Phase 2 - Construction Administration-$8,800.00 <br /> South Precinct EOC Phase 2- Reimbursable Expenses-$1,199.00 <br /> Revised Contract Amount-$45,200.00 <br /> Original Contract Amount-$15,524.00 <br /> Amendment No.1 Amount- $12,177.00 <br /> Amendment No.2 Amount- 17,499.00 <br /> Revised Contract Amount-$45,200.00 <br /> S:\Clark\Projects\EOC\Amend 2 PSA.doc(YJ 7/15/1999) _ J <br />