Laserfiche WebLink
Propo°ed Retail Development J-1443 <br /> 112'�Street and Hwy.99 Feb�uary 26,2004 <br /> ( Evcrett,Washington Page 19 <br /> an allowablc passive earth pressure of 250 and 300 pcf in structural fill and medium dense to <br /> dense native soils, respcctive�y. We recommend usi*�g an allowable base &iction coefficient of <br /> 0.35. <br /> To reduce the lalerz: carth pressure and prevent buildup of water pressure against the <br /> walls, the backfill adjacent to the walls should consist of free-draining granulaz material and <br /> should extend a lateral distance behind the walls a minimum distance of 18 inches. The free- <br /> draining backfill should be continuous to either a footing drain or a weephole drain system. Wc <br /> recommend that all w;,:l backtill conform to Section 9-03.12(2), Gravel Backfill for Walls, as <br /> presented in the 2002 WSDOT Standard Specifications. Compacdon of the backfill is <br /> recommended to achieve a density of 90 pereent of ASTM D-1557 and light hand operatcd <br /> equipment is recommended so that excessive ctress is not applied to the walls. <br /> The above equivalent fluid pressures are based on the assunuption of a uniform horizontal <br /> backfill and no buildup of hydrosiatic pressure behind the wall. Surcharge pressures due to <br /> sloping ground, adjacent footings, vehicles, construction cquipment, etc., must be added to lhese <br /> values. For loading docks, sw�hazge loading on the floor slab abovc ihe dock will result in a <br /> horizontal, uniformly distributed surcharge on the wall equal to 40 percent of the distributed <br /> verticalloading. <br /> Pavcment Desi�n Parameters <br /> ( The native subgrade soils are anticipated to consist of sand and silty, gravelly sand soils. <br /> A California Bearing Ratio (CBR) test was completed on a representauve near-surface sample of <br /> silty sand and a CBR value of 18 percent was obtaincd. All fill used to raise low areas must have <br /> pavement support chazacteristics at least equivalcnt to the existing soils and must be placed under <br /> engincering controlled conditions. It is our opinion that the non-organic native soils encountered <br /> at the site would mcet the minimum recommended CBR criteria. <br /> Asvhalt Concrete Pavement <br /> It must be recognized that pavement desi�t is a compromise between tugh initial cost and <br /> little maintenancc on one side azid low initial cost coupled with the need for periodic repairs on <br /> the other. As a result, thc owner will need to take part in the development of an appropriate <br /> pavcment section. Critical features which govern the durability of the surface include the level of <br /> compaction of the subgrade, the slability of the subgrade, the presence or absence of moisture, <br /> }'ree water and organics, the fines content of the subgade soils, the traffic volume, and the ' <br /> frequcncy of use by heavy vehicles. Our recommendations are based upon a 20-yeaz design life <br /> for standard duty and heavy-duty pavements. <br /> The pavement design recommendations assumc that the subgrade and any structural fill <br /> will be prepared in accordance with the recommendations presented in this report. All till,as well <br /> as the upper 12 inches bcncath the subbase section should be compacted to a minimum of 95 <br /> percent relative compaction, using AASHTO T-180 (ASTM:D 1557). SpecificaUons for <br /> manufacturing and placement of pavements and crushed top couise should conform to <br /> specifications presented in Divisions 5 and 4, respectively, of the 2004 Washington State <br /> J-1443,0?2G04 <br /> Iq i <br />