My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11632 EVERGREEN WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
11632
>
BASE FILE
>
11632 EVERGREEN WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 9:03:47 AM
Creation date
2/10/2017 11:49:05 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
11632
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> J-1443 � <br /> Proposed Retail Development Febniary 26,2004 j <br /> - l l2'�Street and Hwy.99 Page 22 ; <br /> , Everett,We�hington � <br /> described in t1►e Subsurface Condidons section of tUis report� The �nds appear bo 1�e h�S�Y <br /> susceptible to erosion a�d would likelY re4uire P�otecdon. Ground�vater seePaSe m�Y �SO�ve <br /> an impact on both tcmPoraTY a�d P�°�ent slopes a10�d �e�e�;tream oours��e��� <br /> construcrion of walls or rockenes that maY be necessary q�de of dewaterin8 <br /> mea: res may be necessarY durinS the constructio�t cona�on takes pl� and can only be <br /> will likely be dependcnt on tbe time of year <br /> detennined at the time of constructian• <br /> L�—� on the <br /> T�e conclusions and recomm��tions pcesented in this report� b�d, in Patk <br /> explorations accomplished for this scudY• The numb�r' 1°�bOn' ��aep�a�e�'tenfeormauon to � <br /> sia e at the time of Wis ! <br /> were completed witlun the consuaints of budget and site access so as a Yl �ty�reVl��e <br /> fonnulate the recommendations. Project plens were in the preliminarY g � <br /> �eport preparation. We therefore recommend�� me ava�ab e�n order tn conficm that the � <br /> Pr°]ect plans and specifications when they �� in this repoct have been P�P�TIy ' <br /> i <br /> recommendations and design considera�t d F ckage, i <br /> interpreted end implemented into the pr j Sn Pa ; <br /> of earthwork, swctural fill, and foundation and pavement performance ; <br /> We recommend thet a ' <br /> The integritY tiou and construction procedures• � <br /> depend greatly on proper site prePar'° vid:: eotechnical engineerin8 services <br /> qualified geotechnical eag�eering firm be reta�ed to pro 8 <br /> during the eacihwork-rclated construction phases of ihe project• If variations in the subsurface <br /> � condid�ical eng'meeringrecommendatioas to the conuactor and design team inta timely�manner . � <br /> geotec � <br /> as the project construction progresses. <br /> � <br /> t <br /> � <br /> ' i <br /> I <br /> I <br /> I <br /> � <br /> i, ; <br /> I <br /> I <br /> { <br /> i <br /> ; <br /> :, <br /> � � <br /> : <br /> Y1443,022604 <br /> aa , <br />
The URL can be used to link to this page
Your browser does not support the video tag.