My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11632 EVERGREEN WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
11632
>
BASE FILE
>
11632 EVERGREEN WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 9:03:47 AM
Creation date
2/10/2017 11:49:05 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
11632
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Reteil Development J-1443 <br /> 1 l2'^Street and Hwy.99 Febcuary 26,2004 <br /> ( Evetett,Washingron Page 22 <br /> � <br /> described in the Subsurface Conditior�a section of this report. The sands appeaz to be lughly <br /> susceptible to erosion and would likely require protection. Grouadwater seepage may aleo have <br /> an impact on both temporary and petmanent slopes along the stream, as well as the design and <br /> construcrion of walls or rockeries that may be necessary W define the stream course. Dewatering <br /> mcasures may be necessary during the construction of the channel. The magnitude of dewatering <br /> will likely be dependent on the time of year that construction takes place and can only be <br /> determined at the time of construction. <br /> �LOSURE <br /> The conclusions and recottunendations presented in ihis report are based, in parl, on the <br /> explorations accomplished for tlus study. The number, location, and dep� of the explorations <br /> were completed witk�in the constraints of budget and site accesa so as to yield the infarmation w <br /> formulate the recommendatioiu. Project plans were in the preliminary stag at the time of t6is <br /> repo:t preparafion. We therefore recoromend that ZZA be provided the opportunity to review the <br /> project plans and specifications when they become a��ailable in order to confinn that the <br /> recommendations and design conside:ations presented in this report have been properly <br /> interpreted and implcmented into the project design package. <br /> The integrity of eazthwork, structu�al fill, and foundation and pavement perfonna►ice <br /> depend �ready on proper site preparation and construction pmcedures. We recommend that a <br /> qualified geotechnical engineering firm be retained to provide geotechnical engineering services <br /> ( during the earthwork-rclated construction phases of the project If variadons in the subsurface <br /> condifions aze observed at that time, a qualificd engineer would be abte to provide additional <br /> geotechnical engineering recommendadons to the wntractor��d design team in a timely manna <br /> as the project construction progresses. � <br /> i <br /> i <br /> 1 <br /> ; <br /> i <br /> J-1443,022604 � � <br /> 7 <br /> aa. i <br />
The URL can be used to link to this page
Your browser does not support the video tag.