Laserfiche WebLink
. i <br /> 18. A ['ublic Works Permit is required for this project. Detailed drawings in accordance with City Design <br /> and Construction Standards shall be submitted to tY�e Public Works Department, sho�ving site parking � <br /> layout, landscaping, utilities, stonn drainage, temporary construction erosion control, and all required ; <br /> improvements in tlie public right-of-way. Puhlic Works Department approvaf of these drawings is <br /> required prior to any permits being issued. All improvements shall be compieted, approved and <br /> warranted before the Occupancy Permit is issued. <br /> 19. Parking must be per City Zoning Code and City Design and Construction Standards for Development. i <br /> A minimum of 117 off-street parking spaces is required. <br /> 20. Any grading/fill on this site shall be done so as to not impact the surrounding properties. � <br /> 1 <br /> 21.This project must comply with the current City of Everett IIuilding Code and Sprinkler Ordinance. � <br /> 22. Special charges for connection to the sewer and �vater systems in accordance with Ordinance 1998-94 y <br /> and subsequent revision are applicable. These charges are based on projected water usage and can be i <br /> substantial. Applicant is cncouraged to obtain a copy of the Ordinance and determine estimated y <br /> charges prior to building permit application. '1'lie actual charges shall be computed by the Public <br /> Works Department per the ordinance in effect at the time and according to the information on the <br /> approved plans at th�� time of building permit issuance. <br /> t <br /> � <br /> 23. Lack of com�uent on tlie plans suUmitted witli application does not constimte approval of these plans. ` <br /> 24. A tire hydrant is rcquired wiUiin 200 Jriving fcet but not closer than 50 feet of every structure. <br /> 25. City streets are to be kept clear of dirt and debris at all times during construction. llust suppression <br /> and S[reet cleaning must occur as directed by the Public Works Inspector. <br /> 26. A one-ycar �varranry is required on the public improvement f'or an amount not Icss than 10�� uf thc <br /> cost of construction and sUall run ibr one year from die date of issuance of the first Occupancy Permii. <br /> 27. On-si!e �i�ater main will be stakecl within an easement to die Ciry. The easement will he submitted to <br /> tl:e City prior to issuance of permits. � <br /> 28. As-builts of storm sewcr, sanitary sewer, and water systems will be required to be submitted per Ciry <br /> design and Construction Standards and Specifications for Development. <br /> 29. Walkways must bc provided from the entryways of eadi building to the public sidewalk. <br /> 30.'fhe traffic mitigation fee o�553,139.00 is quired prior to issuance of any building permit. <br /> 31. Left turns into and out of Uic Evergreen Way driveway are pruhibited. The street design plans for <br /> Lvergreen �'��ay must s12ow how the turns will 6e prohibited per Ciry 'Craffic Engineer approval. <br /> r, <br />