Laserfiche WebLink
, . � <br /> Plan Check No. B-61136 <br /> December 24, 1998 <br /> Page 3 of 3 <br /> � The fire-resistance of the existing corridor should be maintained, or a new study <br /> complying with the 1997 means of egress provisions should be provided. <br /> 7. The following comments apply to accessibility issues: <br /> al New doors aze required to comply with clearances as specified in Section ' <br /> 1106.10. <br /> b) The�oors to the accessible restroom stalls should swing out. <br /> c) Two water fountains are required – one accessible, the other mounted at a <br /> standard-height. <br /> d) At least one reception counter should be a minimum of 36" wide and a <br /> marimum of 36" high. <br /> Prepare a response letter showing where each item m this correction letter is addressed <br /> on the plan set. <br /> Upon resubmital of the drawings, your application will be given pciority and plan review <br /> will commence. <br /> All required submittals shall be of sufficient detail and contain su`ficient information to <br /> ensure that ,he proposed structure will be constructed in compliance with all adopted <br /> codes. <br /> Sincerely, <br /> G��`Z/ !/ — <br /> Tony Lee <br /> Associate Engiueer <br /> TL:jt;.�61136 <br />