Laserfiche WebLink
• The catch basins have been identified in Detail 4 as catch basin #5 and catch basin #8. <br />• Detail 4 now specifies the typical restrictor installation on the 12" pipe. <br />• Detail 5 (detention pond) has been modified to specify a 6'-high chain link fence with an access gate. <br />• A planting schedule for the detention pond per Everett City Standard 3-3.5.1 Item 10 is provided on sheet Ll. <br />Since your February review of our permit set, we feel that we have satisfied all of your concerns and are providing a <br />complete permit application. Please feel free to contact me if you need any additional information. Thank you for your time. <br />Sincerely, `1 , <br />"&It <br />Dave du Mars <br />FREIHEIT & FIO ARCHITECTS, INC., P.S. <br />