My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9512 EVERGREEN WAY 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
9512
>
9512 EVERGREEN WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 3:36:10 PM
Creation date
2/10/2017 2:23:55 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9512
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r To FILE , w <br />FROM Joe Kozlovski <br />DATE March 8, 1985 <br />�. <br />G::�� <br />SUBJECT B�NCH LIBRARY CONSTRUCTION SCHEDULE <br />CITY OF EVERETi, Ea@flET'f'NASHINGTON <br />A1 Rosensweig and I met with Bob Bocott of iVestrlark Industries on <br />the site on Thursday afternoon and reviewed the utility services <br />connections. it appears that there will be no Froblems with the <br />hook-up except that the size of line between the branch library and <br />the service line must be 6" instead of 3" as proposed. The utility <br />sub-constractor is Russ Johnson. <br />The schedule for moving is extended four days as follows: <br />Move the units on the site Friday, March 15th and Monday, <br />March 19th. <br />PUD power connection for Wednesday, Mar.ch 19th. <br />Carpet and ceiling installation on Wednesday, March 19th. <br />City crews may begin installing shelving Thursday, March 20th. <br />This schedule has one day built-in time cushion. <br />The revised location is going to necessitate elongatinq the han3i- <br />capped ramp from 20 feet to 32 feet. It will be necessary to separate <br />the ramp from the building to let it terminate on the pavement north <br />of the landsraped area. This requires a handrail on both sides of the <br />ramp. <br />After the sewer and water connections are made, it will be necessary <br />to patch the paving in front of che Library where public parking is <br />scheduled. <br />cc: Don Lind <br />Larry Crawford <br />Mary Riordan <br />a <br />J <br />� <br />si <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.