Laserfiche WebLink
�', <br />7. Cr:;� streets and alley3 are to be kept clear of dirt and debris at all <br />�' ti�ue, during construcCion. Dust suppression and street cleaning must <br />occui as directed by :he Public Wozks Inspector. During construction, <br />all truck traffic to and from �he site �oithin the City of Everett shall <br />be on arterial streets unless otherwise approved by the Public Works <br />Department. <br />L <br />� <br />8. ?articipation in the cost to fund the South End Interceptor is "� <br />re•�uired. The actual cost shall be computed by the Building Department <br />per the ordinance in effect at the time and according to the <br />information provided on the approved plans on the date of permit <br />issuance. <br />AND BE IT FINAI.LY ORDERED that a copy of this written order be <br />transmitted [c the Applicant for their information. <br />Date: <br />' '� <br />� . , � l�, , <br />,,; r,:.;;;� �:cti_ ,�' _.-��lf''�� �� 'CG��i <br />Dennis L. Derickson' <br />Planning Director <br />, 0636F <br />-2 - <br />� � <br />