Laserfiche WebLink
` • �. <br />Responsible <br />Official: <br />Title: <br />Address: <br />Date: <br />Signature: <br />Paul A. Roberts <br />Planning and Community Development Director <br />2930 Wetmore Ave, Suite 8-A, Everett, WA 98201-4044 <br />June 26, 2001 <br />� /�. �,n ,��..� �• <br />The fourteen (14) day public comment period for this proposal ended on June 20, 2001 and the <br />City did not receive any comments. <br />You may appeal this determination by filing an appeal on forms provided by the Planning <br />Department and a fee to the Planning/Community Development Permit Services Countec at 3200 <br />Cedar Street, 2nd Floor, no later tltan 14 days from the date the MDNS become� final (which is <br />after the 14-day commant period). <br />Contact Faheem Siddiq to read or ask about the procedures for SEPA appeals. <br />NOTE: A DNS may be withdrawn in the event of significant changes in the proposal, <br />disclosure of new significant information, misrepresentation by the applicant, or <br />failure to comply with the conditions upon which this Determination of Non- <br />Significance is predicated. <br />MITIGA..TI4N OF 4DVERSE IMPACTS BY SEPA <br />Any grading/fill on tnis site shall be done so as to not impact the surrounding properties. <br />(SEPA Earih, Land and Shoreline Use Poficies). <br />2. The applicant must obtain a building permit from the Public Works Department. (SEPA <br />Earth and Land Use Policies). <br />