Laserfiche WebLink
7. The proposed facility will not be manned <br />maintenance visit per month is required. <br />(exhi6it 1, Siddiq testimony) <br />and will not generate tra�c. Only one <br />There will be no adverse traffic impacts. <br />8. One parking stall will be provided on-site for monthiy maintenance visits. The <br />proposed project will not iinpact off-street parking, on-site circulation, or site <br />access. (exhibit 1, Siddiq testimony) <br />9. As proposed, tl � antennas will be mounted on the utility pole. The equipment <br />cabinet will be located within the Shurgard mini-storage property and will be <br />screened with a six foot high slated chain-link barbed wire fence and locked gate. <br />Other properties have landscaping that will effectively screen the equipment <br />cabinet. (exhibit 1, Siddiq tesfimony) <br />10. The equipment cabinet will be set back approximately 70 feet from the street <br />centerline, allowing a landscape buffer to remain. (exhibit 1, Siddiq tesfimony) <br />11. The proposed facility will not adversely impact surrounding residential uses and <br />will not create additional light glare or shadow impacts on surrounding properties. <br />(exhibit 1) <br />12. There are no signs proposed for the project. (exhibit 1) <br />13. A landscaping buffer exists along Evergreen Way adjacer'to the Shurgard mini- <br />storage facility, and it will be enhanced to screen the equipment cabinet and <br />fence from view. There will also be a fence with painted slats around the <br />equipment cabinet. No landscaping is required for the project. (Siddiq <br />testimony) <br />� 14. <br />15. <br />There will be no generation of noise, smoke, dust, odor, glare, visual blight, or <br />other undesirable impacts. (exhibit 1, Siddiq testimony) <br />All building and other permits must be obtained prior to final constn�ction. (Siddiq <br />testimony) <br />16. The proposal is consistent with Everett's Comprehensive Plan vihich �romotes <br />the collocation of utilities as a means of reducing environmental impacts and <br />promotes the efficient use of land. (Siddiq testimony) <br />17. �� addition to the General Evaluation criteria, the Specific Evaluation criteria of <br />EW1C 19.41.150.D.'I.c must he satisfied. A Specific Evaluation is required <br />because the facility is within 200 feet of a Gateway Corridor and exceeds the <br />replaced pole by more than 20 feet. These critena include: <br />:� <br />