Laserfiche WebLink
vuy v� �ra� oaa <br />Shc'iins Management Act of 1971 "� <br />Permit fo� Shoreline Management <br />Substantlal Development <br />Type of Action(s) <br />X Substantial Development Permit <br />_ Conditionaf Use permit <br />_, Variance Permit <br />Application #: SMA# �3_gq <br />Date Received: 1g�� <br />APProved: X Denied: <br />Date: filS/.95 <br />Pursuant to Chapter RCyy gp,5g� a pe�Mt is hareby grante�l to; <br />Port of Everett <br />P.O. Box 538 <br />Everett, Wa. 98206 <br />to undertake the followtng developmerrt: To deepen an existing ship berth <br />located at Pier 1 South from 25 feet to -45 feet (MLLVV) by dredging <br />approximately 90,Opp cubic yards of sedimeM by Gamshell dredge and barge. <br />Port of Everett also proposes to replaoe warehouse capacity lost at Pier 1 South <br />(60,000 square feet) through construction of a new 50,000 square foot multi- <br />Purpose warehouse upon the following property: Port of Everett Pier 1 located <br />in the �IV 1/4 of Section 19 and NW 1/4 of Section 30, Township 29 ,N Range <br />5,�. W.M. witl�in Port Gardner Ba,y and/or its associated vvsUands. <br />Ths project wi11 ba within shorelines of atate-wide signiflcance (RCVU <br />90.58.030). The project will be located within an rban deaignation. The <br />following City of Everott Master Program provisions are appiicable to this <br />devslaPmer�t. �V-6 8� 7, iV-10 &11, IV 20 - 22, IV-43 - 45, N-53 $ 54 <br />Developmerrt puraua�rt to this permit shall be undertaken pursuant to the <br />���owin9 tem�a and conditfona: <br />Refer to Attachment "A" <br />This permit is granted pursuant to the Shoreline Management Act of 1971 and <br />nothing in this permit shali excuse the Applicant from compliance with any other <br />federal, state or local statutes, ordinances, or regulations appiicable to this <br />