My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2731 FEDERAL AVE 2018-01-02 MF Import
>
Address Records
>
FEDERAL AVE
>
2731
>
2731 FEDERAL AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2022 10:42:40 AM
Creation date
2/10/2017 3:33:46 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2731
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />H <br />9HaW <br />HEX <br />�C A <br />H0 <br />'Otl H <br />N H <br />7Qp. <br />�Ho <br />H tv <br />m g <br />�H <br />ZH <br />grA <br />O rA <br />195 <br />HW <br />H 00 <br />City of Everett W-4558-3 <br />18 June 1992 Page 2 <br />The locations of proposed monitoring well PMW-1 and the proposed recovery trench are shown on Figure <br />1. A schematic diagram of the proposed recovery trench is shown on Figure 2. The area to be included <br />in the GPR survey is shown on Figure 3. The length of the recovery trench shown in Figure 1 is <br />approximate. The actual length is dependant upon the results of the test pit subsurface exploration. <br />The entire project would be conducted as 3 separate events as follows: <br />1) GPR survey (1 event, 1 day); <br />2) test pit exploration and recovery trench installation (1 event, 3 to 4 days); <br />3) drilling (1 event, 1/2 day). <br />Some traffic flow revision would be required to conduct the test pit exploration, the recovery trench <br />installation, and the drilling. The GPR survey would just involve restricting parking from the survey area. <br />Our proposed traffic control plans for each event have been included as Figures 4,5, and 6. <br />The dates when the work would be conducted is dependant upon subcontractor availability, coordination <br />of access with other land owners involved with this project, and attainment of the street use permit from the <br />City of Everett. The city of Everett would be notified prior to beginning any work on city property. <br />Should you have need of any additional information, please do not hesitate to call me at 820-4669. <br />Imo' ! Respectfully submitted, <br />C�' RZA AGRA, Inc. <br />a � <br />Timothy J. Pete <br />Project Hydrogeologist <br />David G. Cooper, P.G. <br />Associate Environmental Geologist <br />TJP/DGC/SB <br />L, AGRA <br />Earth & Environmental Group <br />rsmav� <br />
The URL can be used to link to this page
Your browser does not support the video tag.