Laserfiche WebLink
Geologic Investigation and Geotechnical F_n¢ineenrig Re ' <br />Jones Residence <br />3611 Federal: l ve. <br />Everett, Washington <br />98-08-10 <br />Due to the varying depths of Topsoil remaining across this site, we anticipate that the top elevation of the <br />Transitional Beds (Otb) Silt will vary considerably around the site. Excavation depths for the removal of <br />the remaining Topsoil will range from one (1) to three (3) feet below existing site grades based upon the <br />site investigations. Actual depths excavated at the time of construction may be more than those estimated <br />herein. Topsoil thickness in any one location may result in the removal of materials to below the designed <br />footing elevations. No footings should be founded in or above any Topsoil, undocumented fill, or loose <br />native soil. As mentioned previously in this report, the basal silt is moisture sensitive. The engineering <br />characteristics of the silt will change once it becomes moisture disturbed. Because of this, any moisture <br />disturbed silt will have to be removed from below the footing excavations prior to placement of any <br />concrete. Recommended footing support alternatives are given below - in order of the most to least <br />desirable: <br />1) Prepare building site as recommended above. Grade and fill building site with <br />structural fill as necessary to meet building elevations. Excavate footing areas to <br />natural soil as confirmed by (E.S, Inc. Proof roll and compact exposed siaiace to a <br />non yielding condition. Replace any yielding soil with 2" to a" crushed rock as <br />oullined above. Place footings directly upon approved, undisturbed natural soil or <br />crushed rock cis directed by GE.S, Inc. Foundations should be placed a minumon 1'" <br />into the approved bearing .coil in order to achieve the maximum hearing support as <br />.specified in this report. <br />2) Upon the approved subgrade surface, grade crud fill building site with .structural fill to <br />floor grade. Excavate helow.foundation areas through structural fill back clown to rile <br />"Transitional Bed (Otb) Silts and backfll with controlled density fill (CDF) to footing <br />elevations. CDFshotdd extend a minimum six (6) inches beyond the outside ol;joolings <br />tit all directions. Place footings upon CDF or upon natural, undisturbed .coil as <br />approved by GE.S, Inc. <br />3) Grade and fill building site with 2" minus crushed rock to base of fi�oting elevation. <br />The area between the footing elevation and grade may be filled with approved <br />structural fill. Excavate through structural fill and place footings directly upon <br />crushed rock as obsen ed and approved by GE.S, Inc. <br />12 GES, Inc. <br />