Laserfiche WebLink
August 279 1980 <br />Donald L. Berkey, P.E. <br />Chief Distribution Engineer <br />Snohomish County P.U•D. <br />P. O. Box <br />1107 <br />EWA 98206 <br />verett, <br />P.U.D. Permit l� 80-19 <br />W.O. # P.S. 34 <br />Subject: <br />the Evergreen <br />CITY OF <br />everett <br />CITY MAU.. 25M735 <br />eYCMeTT. WASMIMOTOM <br />.a.ol <br />Dear Mr. Berkey: <br />Your application for a permit to install an underground power syst tonn <br />the public right-of-way per <br />toserve Luther Child Center has been approved <br />August 279 1980, asp plans. <br />The subject permit approval is based on the agreement that all work will be <br />carried out in accordance with the City of Everett standards and American <br />public Works Association specifications for trench excavation and backfilling <br />(Reference: Section 61, par. 3.05 and 3.06).roved hard surconsu face on methods street crossings <br />shall be by jacking, boring or other preapp <br />It will be the obligation of the utility company to bear any costs that may be <br />incurred in testing and confirming the requirement. <br />The restoration of all landscaping and repairs will be comparable with its original <br />condition and to the satisfaction of the City Engineer or his appointed representative. <br />It will be your responsibility to contact the City Engineering Department (phone <br />259-9911)immediately prior to starting construction. <br />Sincerely, <br />HUGH WARREN, P.E. <br />Public Works Director/ ity Engineer <br />4 ° L <br />0� <br />By: Jeff Kerwin <br />Utility Inspector <br />JK:jcl <br />