My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4526 FEDERAL AVE 2018-01-02 MF Import
>
Address Records
>
FEDERAL AVE
>
4526
>
4526 FEDERAL AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2022 1:45:42 PM
Creation date
2/10/2017 4:41:41 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
4526
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l+1 H <br />N�HM <br />offo LUTHER CHILD CENTER <br />H C Foundation Relocation Program <br />Scope of Work: <br />Q• <br />H 1. Demolish existing kitchen and dining area in Building #7 on <br />�i main campus. Proceed with reconstruction at direction of LCC <br />y facilities staff. <br />(A 2. Repair sub -roof sheathing where ventilators penetrate roof <br />y structure. Prepare for re -roofing. <br />orn 3. Remove existing sheet vinyl flooring in all areas except that <br />of the new service area office #6. <br />4. Level floor area at location of existing kitchen drain. <br />5. In -fill existing exterior doors with windows to match the <br />3'0" x 4'0" used elsewhere in the project. A minimum of one <br />P% (1) window in each office will Ye able to open. Sliding <br />windows are preferred.OXCRTOM + g <br />�6 6. Ceilings will be repaired or replaced as required. <br />pwu�►� v�w►aauusw. <br />7. Insulate ceiling cavity. �ew �?o�C�) ._.)sip l�t(p• <br />8. All interior partitions to be sound insulated. <br />1 ' 9. Partitions to be constructed of metal studs with 5/8" gyp. <br />10. New doors to be solid core birch or maple (as in main <br />administration); the same for trim and casings. All doors <br />Ukeyed at direction of owner. <br />11. The door between the storage area #6 and restroom area #7 <br />will be weather sealed for sound and dust control. <br />1 ' 12. All materials and hardware will be new. <br />13. Provide lighting per electric plan. Use Class A fixtures with <br />Paraloom lens. Down lights and track light to match <br />_ existing as used in the admin/clerical waiting reception. <br />14. Provide 36" deep counter with sink and under -counter ref. in <br />area #6. Provide microwave shelf adequate to support unit <br />provided by Foundation. <br />15. Provide heavy-duty wall standards -- brackets and shelves in <br />area #6 -- shelving should be fine high. <br />---_ 16. Provide new lighting in restroom and service corridor. <br />Jt <br />17. Provide new vinyl floor in restroom and service corridorRF F.NEFpR <br />p.1' `NCi <br />Eu1l <br />
The URL can be used to link to this page
Your browser does not support the video tag.