Laserfiche WebLink
18. Provide heating units (electric) in all areas; repair and <br />reuse existing where possible. (If cost effective, consider <br />small heat pump). <br />19. All partitions will be painted; woodwork Gill be finished <br />natural. <br />20. Office areas and reception floors will be carpet. <br />21. Re -work and install work ledge tables (existing) in office <br />area i2. <br />22. Use drawings provided as guide. All final product selection <br />will be determined by contractor and owner. <br />EVEAeV:011 <br />f,i.t <br />�3V <br />