My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 FIRLAND PL 2016-01-01 MF Import
>
Address Records
>
FIRLAND PL
>
2010
>
2010 FIRLAND PL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 7:38:03 AM
Creation date
2/10/2017 5:00:52 PM
Metadata
Fields
Template:
Address Document
Street Name
FIRLAND PL
Street Number
2010
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. Connect side sewer per City Standard #601. <br />5. Connect side sewer per City Standard #'s 601, 602, 604. <br />6. Connect all rooftop downspouts lo lhe side sewer. <br />7. Connect rooftop downspouts to the drainage system provided for this lot. <br />l�� <br />� <br />1� <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />tAanual 3-2.6.2. The approximale size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more details. <br />The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project. <br />Install erosion controi measures as determined by the Public Works inspector, such as silt fence, slraw <br />bales, swa!es, or erosion biankets. <br />11. Inslall erosion control measures per City of Everett Standards for small parcels <br />12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />'� 1 All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permilted site. No wasting of material is allowed on this building lot. <br />No dirt, mud, rocks or debris to be tracked or.to roadway. <br />No building materia�s to be stacked on sidewalks and sidewalks to be kept clean and open for <br />pedestrian travei. <br />Adjusl water meter box 1" above sidewalk grade. <br />F2emove and replace curb, gutler and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br />this proposal's frontage �s directed by the Public Works Inspector (i.e. ail unused driveways and any <br />broken or damaged area must be replaced). <br />Inslall a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />20. Contact the _ <br />sewer services. <br />21. <br />22. <br />23. <br />Water District for connecting provisions for this building's water and <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br />13D. <br />PWCommenfs <br />
The URL can be used to link to this page
Your browser does not support the video tag.